Eden Prairie, MN | March 2024

Southwest Transit Authority Solar Project + EV Chargers

ELECTRIC VEHICLE (EV) CHARGERS:

SOUTHWEST STATION:
(12) Single port wall mounted ZEF level 2 EV chargers
(2) Dual port pedestal mount ZEF level 2 Pro EV chargers
Provide bollards to protect the PRo EV chargers on the first floor
Coordinate electrical shutdown with SWT

EAST CREEK:
(4) Single port wall mounted ZEF level 2 EV chargers
Coordinate electrical shutdown with SWT

SOUTHWEST VILLAGE:
(4) Single port wall mounted ZEF level 2 EV chargers
Coordinate electrical shutdown with SWT

EDEN PRAIRIE BUS GARAGE:
(8) Single port wall mounted ZEF level 2 EV chargers
(1) Dual port ZEF level 3 Tritium RTM 50kW dual port rapid EV charger inside the garage
Coordinate electrical shutdown with SWT

SOLAR PV – EDEN PRAIRIE BUS GARAGE ROOFTOP:
203.5 kWdc roof mounted solar photovoltaic (PV) array to be installed atop the Eden Prairie bus garage.  
Equipment:
    (384) bi-facial solar modules
    (1) 60 kW inverter and (1) 50 kW inverter 
    Rooftop solar racking system, ballast blocks, and slip sheets.
    Data acquisition system (DAS)  
 

SOLAR PV – SOUTHWEST STATION CARPORT
180.7 kWdc fixed tilt parking garage solar photovoltaic (PV) array to be installed at the SouthWest Station parking garage.  
Equipment:
    (341) bi-facial solar modules
(3) 50 kW inverters 
Data acquisition system (DAS)
Structural steel including galvanized steel columns, beams, and purlins.
Aluminum z-channel racking supporting the solar modules
 