MSP Airport Concourse G Infill

The MSP Terminal 1 - 2020 Concourse G Infill and Delta Sky Club Project includes expansion of the terminal building footprint and renovation of space within the terminal at the ground, main, and upper levels. 

PREFABRICATION IS KEY TO SUCCESS

Ductbank was installed for communications, medium voltage, and 480 volt distribution.  The following is the impressive list of quantities and sizes of items that were prefabricated in the shop and then installed at the jobsite:

  • 4” 4 Cell Duct Bank - 845 Linear Feet
  • 4” 6 Cell Duct Bank - 100 Linear Feet
  • 4” 10 Cell Duct Bank - 35 Linear Feet
  • 4” 12 Cell Duct Bank - 115 Linear Feet
  • 4” 18 Cell Duct Bank - 230 Linear Feet
  • 5” 2 Cell Duct Bank - 115 Linear Feet
  • 5” 4 Cell Duct Bank - 460 Linear Feet
  • 5” 6 Cell Duct Bank - 560 Linear Feet
  • 5” 8 Cell Duct Bank - 610 Linear Feet