Warren, MI | July 2020

Fiat Chrysler Warren Truck Plant Upgrade

This project included a design/assist upgrade to the existing pretreatment and e-coat system in the paint shop.  All of the work was completed during an extended plant shutdown during 2020.  Hunt performed a complete demolition of existing MCC’s, control panels, conduit, and wiring.  Next up was the installation of all the new MCC’s, control panels, motor and control wiring.  The project also included replacement of housing and dock light fixtures, and the addition of new inspection deck lighting and receptacles.