Southwest Transit Authority Solar Project + EV Chargers
Eden Prairie, MN
Electric Vehicle (EV) Chargers
Southwest Station:
(12) Single port wall mounted ZEF level 2 EV chargers
(2) Dual port pedestal mount ZEF level 2 Pro EV chargers
Provide bollards to protect the PRo EV chargers on the first floor
Coordinate electrical shutdown with SWT
East Creek:
(4) Single port wall mounted ZEF level 2 EV chargers
Coordinate electrical shutdown with SWT
Southwest Village
(4) Single port wall mounted ZEF level 2 EV chargers
Coordinate electrical shutdown with SWT
Eden Prairie Bus Garage:
(8) Single port wall mounted ZEF level 2 EV chargers
(1) Dual port ZEF level 3 Tritium RTM 50kW dual port rapid EV charger inside the garage
Coordinate electrical shutdown with SWT
Solar PV — Eden Praire Bus Garage Rooftop:
203.5 kWdc roof mounted solar photovoltaic (PV) array to be installed atop the Eden Prairie bus garage.
Equipment:
(384) bi-facial solar modules
(1) 60 kW inverter and (1) 50 kW inverter
Rooftop solar racking system, ballast blocks, and slip sheets.
Data acquisition system (DAS)
Solar PV — Southwest Station Carport
180.7 kWdc fixed tilt parking garage solar photovoltaic (PV) array to be installed at the SouthWest Station parking garage.
Equipment:
(341) bi-facial solar modules
(3) 50 kW inverters
Data acquisition system (DAS)
Structural steel including galvanized steel columns, beams, and purlins.
Aluminum z-channel racking supporting the solar modules
From routine maintenance to large-scale installations, Hunt Electric delivers dependable, code-compliant electrical services tailored to your project’s needs.
