Grand Portage Land Port of Entry Generator Replacement

Grand Portage Land Port of Entry | 250 kW Diesel Generator and Automatic Transfer Switch Replacement

Upgrading from a 39 kW to a 250 kW Generator at an Active U.S. Border Crossing

The Grand Portage Land Port of Entry is a federal border crossing along Highway 61 in northeastern Minnesota, near the Canadian border. In October 2023, Hunt Electric completed a generator replacement project at the General Services Administration (GSA) facility.

The project involved replacing the facility’s existing 39 kW diesel generator with a new 250 kW three-phase diesel generator and automatic transfer switch (ATS). The upgrade took place within a secure, operating federal facility, requiring careful coordination to maintain normal operations throughout construction.

Coordinating Generator Replacement at a Secure Border Facility

Working within an active border crossing presented several challenges for the Hunt Electric team. Construction activities had to be coordinated around ongoing facility operations while meeting the access and security constraints associated with a federal port of entry.

Equipment availability added another layer of complexity. The project team faced product availability challenges during the COVID-19 pandemic, making equipment procurement an important consideration alongside the requirements of working at an operational border facility.

The combination of secure-site restrictions, continued operations, and equipment availability made planning and coordination central to the generator replacement.

Scope of Work

Hunt Electric performed the generator replacement at the Grand Portage Land Port of Entry. The project scope included:

  • Replacement of the existing 39 kW diesel generator
  • Installation of a new 250 kW three-phase diesel generator
  • Installation of a new automatic transfer switch (ATS)
  • Coordination of construction activities within an operating, secure federal facility

Key Features

250 kW Three-Phase Diesel Generator Upgrade

The project replaced a 39 kW diesel generator with a new 250 kW three-phase unit, significantly increasing the installed generator capacity at the facility.

The replacement also included a new automatic transfer switch, the electrical component used to transfer loads between power sources.

Construction Within an Operating Federal Facility

The Grand Portage Land Port of Entry presented a distinct working environment. As an active border crossing, the facility needed to remain operational throughout construction.

The project required the Hunt Electric team to account for ongoing facility activities and secure-site restrictions while completing the generator upgrade.

Why Hunt Electric

The Grand Portage generator replacement demonstrates Hunt Electric’s ability to coordinate electrical equipment upgrades within facilities that must remain operational during construction.

By addressing equipment availability challenges and working within the constraints of a secure federal border crossing, Hunt Electric completed the generator replacement while maintaining the facility’s operational requirements.

Supporting Generator Replacement in Active Facilities

From generator replacements to electrical infrastructure upgrades, Hunt Electric provides electrical construction and generator services for facilities with demanding operational requirements.

From routine maintenance to large-scale installations, Hunt Electric delivers dependable, code-compliant electrical services tailored to your project’s needs.