Enbridge Hawthorne Pump Station
Hawthorn, WI
Filling In The Gaps
Enbridge has launched several projects to improve the integrity of their system and increase their pumping capacity. Hunt Electric was part of a team charged to fast track this new greenfield pumping station. Construction began with only 60% construction drawings and we worked with the engineer to fill the gaps in the drawings until we were able to get a complete drawing set. Some “on the fly” changes to this job included doing a complete build out of the electrical and VFD buildings instead of the buildings coming pre-assembled. Because of our strong in-house manpower position, we were able to easily add to our crew on short notice, and do this without adding any additional time to the schedule. The project also included a new substation, pumphouse, and DRA skid.
In order to work at an Enbridge site, Hunt Electric employees go through extensive safety orientation, are enrolled in a DOT required drug and alcohol program, and sometimes are required to be operator qualified in demonstrating skills and training when working near active pipelines.
From routine maintenance to large-scale installations, Hunt Electric delivers dependable, code-compliant electrical services tailored to your project’s needs.
