Divo 16 Solar Installation
Divo 16 Solar Installation in Afton, MN
Project Overview: 1 MW Renewable Energy Project
The Divo 16 Solar Installation is a 1 MW renewable energy project designed to seamlessly integrate with the Xcel Energy grid and deliver reliable solar power to the region. Hunt Electric completed the full electrical scope of this fixed-tilt solar array, ensuring long-term system durability and high-performance energy generation.
The installation features fixed-tilt racking, photovoltaic panel assemblies, and all associated wiring. A robust CAB cable management system supports panel wiring across the array, providing clean organization and enhanced long-term maintainability.

Electrical & System Integration
Hunt Electric’s crews consolidated panel circuits into the site’s string inverters, with each inverter output feeding into the main switchgear at the point of interconnection (POI). This ensures safe, efficient, utility-ready power delivery.
To enhance productivity and ensure consistent installations, Baer Manufacturing supported the project through precise prefabrication efforts, streamlining onsite work and improving installation quality.
Navigating Challenging Terrain
The project site presented significant terrain challenges. The racking and panels were installed on a very tall and steep hill, with the base of the slope located in a 100-year flood plain. This required adjustments to meet National Electrical Code (NEC) clearances, including:
- Mounting inverters higher than typical installations
- Raising ground-mounted components to sufficient elevations
These adaptations ensured both safety and compliance across the array.
Scope of Work
Hunt Electric delivered the complete electrical construction package for the 1 MW Divo 16 solar installation, supporting the project from array assembly through utility integration. Our scope included installation of fixed-tilt racking, photovoltaic panels, structured panel wiring, inverter integration, and final commissioning activities. Our team’s scope included:
- Installation of fixed-tilt racking system
- Installation of photovoltaic panels
- Routing and support of panel wiring using a CAB cable management system
- Circuit consolidation into the site’s string inverters
- Inverter output integration to the main switchgear at the POI
- Prefabrication support from Baer Manufacturing to accelerate field productivity
- Breaker and grounding verification completed by Power Solutions
- Completion of the required single-phase anti-islanding test prior to energization
Prefabrication provided by Baer Manufacturing helped streamline installation sequencing, while Power Solutions performed the project’s testing and commissioning procedures.
Key Features
- 1 MW fixed-tilt solar installation
- Full electrical construction, panel wiring, and CAB cable management integration
- String inverter consolidation and utility-grade POI connection
- Comprehensive testing and commissioning, including anti-islanding validation
- Specialized installation on steep terrain and flood-plain–adjacent site
- Prefabrication support for improved installation sequencing and efficiency
Renewable Energy Solutions Built for Reliability
Hunt Electric delivers high-performance solar installations with safe, efficient electrical integration and proven utility coordination.
From routine maintenance to large-scale installations, Hunt Electric delivers dependable, code-compliant electrical services tailored to your project’s needs.