Skip to Main Content
Shreveport, LA | December 2014

Benteler Steel/Tube Facility

The manufacturing facility is being built in two phases. Phase 1 is a hot-rolling tube mill, along with several finishing lines for the production of seamless tubes. Phase 2 includes building an electric arc furnace for producing high-quality steel on-site. The final finished facility (late 2014) will encompass more than 1.35 million square feet and be capable of producing up to 320,000 tons of steel tubes annually.  Hunt’s contract includes the installation of over 120,000 feet of 15kv cables, 335,000 feet of conduit and over 10,000,000 feet of wire.

Market

  • Industrial

Hunt’s Role