This project, which involved highly-detailed work at a Duluth paper mill, demonstrates how we use collaboration and education to leverage technology on the jobsite.

The Sappi PM12 Headbox Replacement project involved coordinating with a model created by a 3D robot. The robot captured pictures of the existing conditions from all angles, locations, and directions and transposed them to the general contractor’s highly sophisticated 3D model. Our team then worked with this model to coordinate and model our own.

A Collaborative Effort for Project Success

Constantly evolving technology puts team members at every stage of the learning curve. Since the owner was new to 3D modeling, we tapped the expertise of the facilities coordinator and the project engineer. This collaboration ensured the appropriate scope was delivered to the owner’s standards.

Technology. Training. Teamwork.

Advancements in technology empower our field teams, too! Our designer helped train our general foreman and foreman, who had no prior experience, to use the programs for prefabrication and installation application.  This 3D modeling education equipped our field leadership for success—benefitting everyone on the jobsite.

Share this article on your favorite platform.

View Our Portfolio

Check out the latest Hunt Electric Projects.

Explore Career Opportunities

Keep Reading

  • June 11, 2015

    Workforce Development has organized a construction industry job fair for Thursday evening (06/11/15).

  • December 6, 2013

    Hunt Electric was recently selected as the electrical contractor on the new south campus facilities building at St. Thomas.

  • February 19, 2021

    Containerized Facilities Relieve Honolulu’s Testing Troubles Reliable rapid detection is the first line of defense against the spread of COVID-19. But accessing the resources and facility space necessary for mass testing has challenged pandemic response efforts worldwide. In Hawaii – the task was even more daunting.